Ninh Binh opens bidding to select contractor for expressway link bet88
The expressway section, part of the Ninh Binh - Hai Phong expressway, has estimated investment capital of over VND4.18 trillion (2 million).

The Management Board of Transport link bet88 Investment and Construction of northern Ninh Binh province has issued a tender invitation for contractor selection to build an expressway section through the province.
The section is part of the projected expressway connecting Ninh Binh with northern Hai Phong port city.
The bidding package No.16 will build the whole expressway section, excluding works relating link bet88 lighting system and road traffic safety (RTS) management systems. Total investment capital is estimated at over VND4.18 trillion (2 million).
The section is 25.3km long, including 12 bridges and three intersections.
The implementation of the package is expected link bet88 last for 20 months.
The bidding will be closed on March 28, at 3pm.
The section is part of the 109-km Ninh Binh - Hai Phong Expressway link bet88, which was approved by the Prime Minister in September 2021. The expressway will run through NinhBinh, ThaiBinhand NamDinh provincesbefore reachingthe port city of HaiPhong.
The expressway link bet88 has 17 bidding packages.